The 401 Group is a prestigious bespoke civil litigation practice based in Blackburn. The company acquired a set of empty offices in the centre of Blackburn, with a view towards turning them into its new headquarters. For that, they turned to our experts here at Altitude Glass.
After an initial planning stage, we embarked on a particularly ambitious project that involved specifying, supplying and installing single glazed glass partitioning and frameless glass doors across the entirety of the site – which spanned three floors in total. (We installed 200 linear metres of glass, or 75 panels, on the second floor alone.) Due to the size of the project and the nature of the location, a significant amount of materials was required, with ultimately around 1 tonne of glass delivered to the site on stillages. Our experts placed a particularly heavy focus on the logistics, and on making sure that the various materials were in the right place at the right time, to prevent any disruptions and ensure that this ambitious project was completed on-schedule.
If you’d like a quote, just get in touch with your sizes and requirements.
If you’re not exactly sure of what you need, don’t worry! Our team are only too happy to help.